Flowback & well testing. Controlled from first flow.

A large fleet of four-phase test separators, iron rated to 15,000 psi, and crews that bring a fresh frac back to surface safely and measure exactly what the well can do.

TCES flowback separator and iron on location
Iron rating
15kpsi
Separators up to
60in
Separator rating
2kpsi
Phases separated
4

Completion

What flowback and well testing do

After a well is fractured, frac fluid, sand and the first hydrocarbons have to come back to surface before the well can go to production. Flowback is the controlled return of that mix: holding back pressure with chokes, catching sand and plug debris, and separating what comes up so each stream can be measured and handled.

Well testing measures what the well can deliver: flow rates, pressures and the split between oil, gas and water. Those numbers drive completion and production decisions, from choke strategy to facility sizing.

How the job runs

Step by step.

  1. 1

    Rig up the spread

    Flowline, choke manifold, plug catcher and separator are set and connected to the wellhead.

  2. 2

    Test the iron

    Every connection is pressure tested before the well is opened.

  3. 3

    Open on a controlled choke

    The well is brought on gradually to protect the formation and the equipment.

  4. 4

    Separate and measure

    Gas, oil, water and solids are split and metered, with readings logged throughout.

  5. 5

    Hand over to production

    Clean-up is confirmed and the well is turned over with its test data.

TCES equipment

What we bring.

Flowback & well testing specifications
Test separatorsFour-phase, 42″ to 60″ diameter
Separator ratingUp to 2,000 psi working pressure
Separation technologyPatented cyclonic and filtration technologies
ValvesHydraulic and manual, rated to 15,000 psi
Choke manifoldsRated to 15,000 psi
Plug catchersHydraulic and manual, rated to 15,000 psi
Testing scopeExploration, appraisal and development phases

“We wanted to take this opportunity to thank the Transcontinental crew for providing high quality service in well testing and the rig up, especially in respect to HSE procedures both in the field and in the office.”

Lead Operator, service company

FAQ

Flowback & well testing questions.

What is flowback?

The controlled return of frac fluid, sand and early hydrocarbons to surface after a well is fractured, before it goes to production.

Why four-phase separation?

A four-phase separator splits gas, oil, water and solids (sand). Removing solids protects downstream equipment and gives an accurate measure of each phase.

What does a plug catcher do?

It traps frac plug pieces and debris coming back with the flow, before they can damage chokes, valves or the separator.

How long does flowback last?

It depends on the well, the completion design and the operator’s goals. Tell us about the well and we’ll put together a job plan.

Request a quote

Tell us about the job.

We reply the same business day. For anything urgent on location, call.

1-281-717-2240

Call now Request a Quote